ASML HOLDING 1 540.800 € (-1,80 %)
ASR NEDERLAND 68.200 € (+0,24 %)
AKZO NOBEL 58.800 € (+2,44 %)
ING GROEP N.V. 28.345 € (-0,25 %)
PROSUS 39.275 € (-0,68 %)
ASM INTERNATIONAL 888.600 € (-2,39 %)
ABN AMRO BANK N.V. 37.980 € (-0,13 %)
V LANSCHOT KEMPEN 66.925 € (+3,68 %)
ARCELORMITTAL SA 57.460 € (-0,97 %)
APERAM 45.600 € (+1,33 %)
RANDSTAD NV 29.450 € (+3,01 %)
ADYEN 851.500 € (+0,58 %)
HEINEKEN 76.140 € (+0,45 %)
DSM FIRMENICH AG 84.160 € (+0,81 %)
AEGON 7.692 € (-0,10 %)
WOLTERS KLUWER 61.080 € (+0,96 %)
HEIJMANS KON 98.300 € (-1,80 %)
NN GROUP 76.220 € (+0,05 %)
AHOLD DEL 35.810 € (-0,28 %)
CVC CAPITAL 13.770 € (+2,08 %)
SHELL PLC 36.080 € (+0,99 %)
BE SEMICONDUCTOR 249.800 € (-2,15 %)
CSG 14.026 € (+3,12 %)
IMCD 85.620 € (+0,14 %)
ARCADIS 34.700 € (+0,52 %)
RELX 28.560 € (+0,56 %)
MAGNUM 16.314 € (+0,04 %)
ACOMO 22.950 € (+0,22 %)
SIGNIFY NV 16.320 € (-1,75 %)
PHARMING GROUP 1.184 € (-1,50 %)
SBM OFFSHORE 31.740 € (+0,83 %)
EXOR NV 68.300 € (-0,36 %)
UMG 18.995 € (+0,45 %)
AALBERTS NV 39.000 € (-0,76 %)
ICADE 18.700 € (+0,32 %)
SCHNEIDER ELECTRIC 267.900 € (-0,65 %)
GTT 188.100 € (0,00 %)
OVH 14.600 € (+0,90 %)
MEXEDIA 3.625 € (-0,14 %)
ELIOR GROUP 2.014 € (+0,20 %)
2CRSI 28.800 € (-6,19 %)
THALES 220.900 € (-1,07 %)
AIR LIQUIDE 174.480 € (+0,10 %)
STEF 123.200 € (+0,16 %)
PERNOD RICARD 63.820 € (-0,59 %)
SAFRAN 331.500 € (-1,37 %)
CAPGEMINI 90.180 € (+1,37 %)
KERING 249.500 € (+0,40 %)
NEXANS 132.200 € (-1,34 %)
KLEPIERRE 36.360 € (+0,61 %)
LVMH 489.600 € (-0,06 %)
WORLDLINE 10.044 € (-1,76 %)
IMERYS 21.300 € (+0,76 %)
AIR FRANCE -KLM 12.985 € (-2,59 %)
SANOFI 76.900 € (+0,88 %)
DBV TECHNOLOGIES 2.860 € (+0,28 %)
STMICROELECTRONICS 61.090 € (-1,47 %)
MICHELIN 34.690 € (-0,52 %)
GL EVENTS 31.700 € (-0,94 %)
EXOSENS 57.100 € (-1,13 %) |
24/04/2023 13:30
NOA Lithium Completes First Drill Hole at its Rio Grande Project, Confirming New Brine DiscoveryTORONTO, ON / ACCESSWIRE / April 24, 2023 / NOA Lithium Brines Inc. (TSX-V:NOAL) ("NOA" or the "Company") is pleased to announce the successful completion of the first hole of the Phase 1 diamond drill program at its Rio Grande project ("Rio Grande" or "the Project"), which has intersected multiple potential lithium brine aquifers of significant thickness. Hole DDH-RG23-001, drilled at the Sulfa X claim reached a depth of 613 meters ("m"), the deepest hole ever reported at the Rio Grande salar ("the salar") and the first-ever drillhole in the alluvium surrounding the surface salar. The basement of basin was not reached and remains open at depth but the drill hole was stopped due to drill capabilities. From surface to approximately 55 m depth the hole progressed through alluvial gravels, and below 55 m through to the full depth of the hole several encouraging salar evaporite and semi-consolidated sedimentary lithologies were intersected, including black sands, fractured halites, gravely sands, carbonate sands and conglomerates. During drilling, brine samples were collected with single and double packer systems, and were tested for electrical conductivity (EC), density, flow rate, total dissolved solids (TDS), temperature, and pH. Packer sampling below 400 m is currently in progress and samples are expected to be collected in the next two weeks. Highlighted intersections up to 400 m include:
Taj Singh, NOA President and CEO states: "We are very excited by results from our first drillhole at Rio Grande - a new brine discovery under alluvial cover, and the deepest hole ever reported at the salar. We intersected multiple brine horizons and have shown the brine potential extends much deeper than previously thought. The brine packer data collected also points to strong potential lithium grades. As one of the largest claimholders at Rio Grande, we look forward to advancing this exciting and underexplored project." Brine packer samples have been sent for laboratory analyses, including a multi-element geochemical package for lithium and other relevant elements; results are expected in the coming weeks. Selected drill core samples will be sent to an accredited laboratory for physical property tests, including drainable porosity. Some packer sampling sites, mainly between 200-300 m, despite being logged as part of high yield brine units, were unable to retrieve testable brine samples, as drilling muds impeded the permeability of the sample site. Sample sites will be left to soak with sodium hypochlorite and washed and then re-tested. The Phase 1 drill program is planned for ~3,000 m (six holes) and is designed to deliver a maiden mineral resource for the Rio Grande project in late 2023 / early 2024. Relevant maps and photos of core and drilling activities can be found at: https://www.noalithium.com/_resources/news/NOA-References-April2023.pdf Drilling Details About the Rio Grande Project Significant exploration has been carried out by various operators at the salar, including extensive drilling. NOA carried out geophysical testing in 2022 on its claims which indicated brine potential under alluvial cover, and for the claims on the surface salar, brine potential was indicated down to below 500 m, significantly deeper than what has been historically drilled at the salar. Certain applicable exploration data suggest that lithium concentrations may increase with increased depths in and around the salar. About NOA Lithium Brines Inc. On Behalf of the Board of Directors, Taj Singh, M.Eng, P.Eng, CPA For Further Information Sample analysis & QA/QC Program Qualified Person References [2] Relevant maps and photos of core and drilling activities related to this release can be found at: https://www.noalithium.com/_resources/news/NOA-References-April2023.pdf Cautionary Note Regarding Forward-Looking Statements This news release may include forward-looking statements that are subject to inherent risks and uncertainties. All statements within this news release, other than statements of historical fact, are to be considered forward looking statements. Forward-looking statements including, but not limited to NOA's future plans and objectives regarding its projects, which constitute forward looking information that involve various risks and uncertainties. Although NOA believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those described in forward-looking statements. Factors that could cause actual results to differ materially from those described in forward-looking statements include fluctuations in market prices, including metal prices, continued availability of capital and financing, and general economic, market or business conditions. There can be no assurances that such statements will prove accurate and, therefore, readers are advised to rely on their own evaluation of such uncertainties. NOA does not assume any obligation to update any forward-looking statements except as required under applicable laws. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. SOURCE: NOA Lithium Brines Inc. View source version on accesswire.com: https://www.accesswire.com/750794/NOA-Lithium-Completes-First-Drill-Hole-at-its-Rio-Grande-Project-Confirming-New-Brine-Discovery Source : Webdisclosure.com |
Cotations différées d'au moins 15 minutes (Paris, Amsterdam, Bruxelles, Lisbonne).
Cotations à la clôture (Francfort, New-York, Londres, Zurich).
Flux de cotations : Euronext (Places Euronext et Cours des Devises).
Bourse : technologie Cote Boursière