CASINO GUICHARD 0.188 € (-1,26 %)
HERMES INTL 1 508.500 € (-11,03 %)
ALFEN 12.310 € (-1,68 %)
ASML HOLDING 1 362.200 € (-1,89 %)
ASM INTERNATIONAL 720.000 € (-4,76 %)
RUBIS 33.300 € (+2,08 %)
CREDIT AGRICOLE 18.370 € (-1,58 %)
SHELL PLC 38.830 € (+2,59 %)
GL EVENTS 31.100 € (+0,97 %)
ALSTOM 16.390 € (+0,37 %)
ABN AMRO BANK N.V. 36.980 € (-2,22 %)
HEINEKEN 80.020 € (+0,43 %)
MAGNUM 16.136 € (-0,82 %)
ASR NEDERLAND 69.740 € (-0,03 %)
ELIS 26.060 € (+1,09 %)
ACCOR 47.290 € (+0,13 %)
VALEO 14.435 € (+0,63 %)
REXEL 34.930 € (-1,47 %)
BNP PARIBAS ACT.A 106.920 € (-1,18 %)
GETLINK SE 18.530 € (-0,54 %)
ARCELORMITTAL SA 57.780 € (-2,17 %)
GTT 192.800 € (+3,66 %)
AALBERTS NV 41.940 € (-0,85 %)
STMICROELECTRONICS 42.895 € (-3,55 %)
DBT 0.043 € (+8,67 %)
STELLANTIS NV 5.281 € (+4,14 %)
HAFFNER ENERGY 0.295 € (+15,91 %)
AMG 26.900 € (-3,31 %)
VEOLIA ENVIRON. 35.150 € (-1,49 %)
ARCADIS 42.000 € (-0,14 %)
SANOFI 79.920 € (+0,68 %)
POSTNL 0.910 € (+0,89 %)
ING GROEP N.V. 28.750 € (-1,32 %)
MGI DIGITAL GRAPHI 10.640 € (+2,70 %)
INVENTIVA 3.930 € (0,00 %)
SOCIETE GENERALE 76.720 € (-0,34 %)
TIKEHAU CAPITAL 17.060 € (-2,51 %)
AIR LIQUIDE 171.480 € (-1,19 %)
UNILEVER 58.430 € (+0,07 %)
SCHNEIDER ELECTRIC 256.800 € (-1,98 %)
BE SEMICONDUCTOR 189.500 € (-4,20 %)
ENGIE 25.970 € (-0,73 %)
LVMH 467.950 € (-0,50 %)
AEGON 8.000 € (-0,52 %)
IPSEN 163.700 € (+2,06 %)
APERAM 46.180 € (-3,51 %)
ORANGE 17.400 € (+1,31 %)
FORVIA 9.242 € (+1,76 %)
TOOSLA 0.002 € (+57,14 %)
AKZO NOBEL 60.760 € (-0,03 %)
VIRBAC 347.500 € (+0,58 %)
TOTALENERGIES 75.830 € (+2,78 %)
CVC CAPITAL 14.410 € (-1,64 %)
ADYEN 881.000 € (-1,37 %)
CAPGEMINI 107.100 € (+5,31 %)
TRIODOS BANK 27.900 € (+0,18 %)
WOLTERS KLUWER 74.100 € (+3,12 %)
SIF HOLDING 4.070 € (-0,12 %)
OCI 4.044 € (-0,39 %)
SES 6.760 € (-1,10 %) |
03/01/2023 06:45
Meyer Burger achieves production plan with volume of 321 megawatts for the year 2022Meyer Burger Technology AG / Key word(s): Miscellaneous
With a production volume of 321.1 MW for 2022, Meyer Burger Technology AG has achieved the guidance of at least 320 MW published in August last year. Meyer Burger’s second production line has been in test operation in August 2022 and in production ramp-up since the end of September 2022. Meyer Burger’s team was able to increase the ramp-up speed significantly compared to the first line by transferring lessons learnt and implementing optimized processes. With the start of the second line, Meyer Burger can manufacture two of the three product variants in parallel, which improves the availability of these products for end customers and installers. At the same time, production efficiency increases because the frequency of necessary product switches is reduced. The ramp-up of the second line is expected to continue throughout the first quarter of 2023. The company plans to start the ramp-up of the third line in Thalheim (city of Bitterfeld-Wolfen, Saxony-Anhalt) and in Freiberg (Saxony) in the second quarter and expects, as announced, a nominal production capacity of around 1.4 gigawatts (GW) at the end of the year and is targeting a production volume for the entire year of between 1.0 and 1.2 GW. “Achieving the 2022 guidance is an important milestone for Meyer Burger. After we again had to solve major challenges due to disruptions in global supply chains, the ramp-up of the second line is now going twice as fast compared to the first line thanks to the great effort of our team,” said Daniel Menzel, COO of Meyer Burger. Contacts: Meyer Burger Technology AG Dynamics Group AG Anne Schneider Andreas Durisch Head Corporate Communications Senior Partner M. +49 174 349 17 90 T. +41 43 268 27 47 M. +41 79 358 87 32 anne.schneider@meyerburger.com adu@dynamicsgroup.chEnd of Media Release
1525653 03.01.2023 CET/CEST Source : Webdisclosure.com |
||||||||||||||||||||||||||||||
Cotations différées d'au moins 15 minutes (Paris, Amsterdam, Bruxelles, Lisbonne).
Cotations à la clôture (Francfort, New-York, Londres, Zurich).
Flux de cotations : Euronext (Places Euronext et Cours des Devises).
Bourse : technologie Cote Boursière