STEF 118.000 € (+0,85 %)
CAPGEMINI 87.960 € (-2,85 %)
MEDINCELL 28.640 € (+5,92 %)
UNILEVER 52.650 € (-1,02 %)
UMG 18.330 € (-0,87 %)
KALRAY 8.760 € (+9,50 %)
ASML HOLDING 1 721.400 € (+6,79 %)
EUTELSAT COMMUNIC. 2.413 € (+7,20 %)
TOTALENERGIES 68.030 € (-0,15 %)
ABL Diagnostics 2.780 € (+11,20 %)
SAFRAN 345.000 € (+2,53 %)
BE SEMICONDUCTOR 287.100 € (+2,94 %)
TOMTOM 4.642 € (+2,11 %)
CSG 12.774 € (-1,51 %)
DSM FIRMENICH AG 83.000 € (+1,69 %)
RELX 27.580 € (+0,51 %)
SANOFI 75.080 € (-0,56 %)
ADVICENNE 1.250 € (-6,02 %)
HERMES INTL 1 598.000 € (-1,08 %)
ARCADIS 33.620 € (+1,76 %)
SODEXO 50.650 € (+0,20 %)
HAVAS 17.050 € (-0,87 %)
EDENRED 22.500 € (+0,67 %)
LVMH 484.100 € (-1,67 %)
KPN KON 4.316 € (-2,60 %)
DANONE 71.740 € (-0,42 %)
UBISOFT ENTERTAIN 5.376 € (+1,43 %)
VINCI 127.800 € (+0,75 %)
SHELL PLC 34.065 € (+1,02 %)
CROSSJECT 1.784 € (-3,25 %)
BOLLORE 4.056 € (-1,07 %)
FUGRO 9.450 € (-0,47 %)
VALLOUREC 20.490 € (-1,11 %)
PLUXEE 11.470 € (+2,87 %)
ID LOGISTICS GROUP 342.000 € (0,00 %)
PREDILIFE 2.300 € (-4,56 %)
MON COURTIER ENERG 5.800 € (+3,57 %)
ENGIE 27.590 € (+0,69 %)
ROBERTET 806.000 € (-1,23 %)
SAINT GOBAIN 79.160 € (+2,09 %)
SOITEC 117.300 € (+2,62 %)
BIC 57.000 € (-0,70 %)
FSDV 18.600 € (0,00 %)
VALNEVA 2.255 € (+1,81 %)
ADYEN 820.400 € (-1,04 %)
MEMSCAP REGPT 4.640 € (+1,31 %)
KERING 247.300 € (-6,91 %)
VICAT 63.500 € (+1,60 %)
AKZO NOBEL 59.340 € (+0,41 %)
AIR LIQUIDE 173.280 € (+0,32 %)
VALEO 12.815 € (+3,81 %)
CHRISTIAN DIOR 449.000 € (-1,49 %)
SHOWROOMPRIVE 0.730 € (-0,27 %)
PLANISWARE 18.180 € (-0,44 %)
AXA 43.850 € (+1,06 %)
CA TOULOUSE 31 CCI 130.060 € (-0,34 %)
DASSAULT AVIATION 287.200 € (+1,27 %)
BOUYGUES 48.810 € (+0,47 %)
IMCD 79.000 € (-0,10 %)
GECINA 73.550 € (-0,68 %) |
16/03/2023 22:55
Nexa Provides Update on Cerro Lindo Mine OperationLUXEMBOURG / ACCESSWIRE / March 16, 2023 / Nexa Resources S.A. ("Nexa Resources" or "Nexa" or the "Company") (NYSE:NEXA) informs that production at the Cerro Lindo mine is suspended due to unusual heavy rainfall levels and overflowing rivers caused by Cyclone Yaku, which has been affecting the region, as well as other parts of the country. Nexa's underground mine received more water than it could pump to the surface, partially flooding some lower levels of the mine. Road access was also compromised. Nexa is closely monitoring and evaluating the situation as it develops and is taking all necessary precautions to ensure the safety of its employees, contractors and host communities. On a daily basis, Cerro Lindo produces approximately 233t of zinc. Production has not yet been impacted month to date. We expect to be able to resume production within the next ten to twelve days, subject to the dewatering process in the underground mine and the impact of rainfall on other areas of the operation. The potential impact on the 2023 guidance and its results are under review. Nexa reiterates its commitment to the health and safety of its employees and will keep the market informed of further developments. About Nexa Nexa is a large-scale, low-cost integrated zinc producer with over 60 years of experience developing and operating mining and smelting assets in Latin America. Nexa currently owns and operates five long-life underground mines - three located in the Central Andes of Peru and two located in the state of Minas Gerais in Brazil - and is ramping up the Aripuanã mine as its sixth underground mine in Mato Grosso, Brazil. Nexa was among the top five producers of mined zinc globally in 2022 and one of the top five metallic zinc producers worldwide in 2022, according to Wood Mackenzie. Cautionary Statement on Forward-Looking Statements This news release contains certain forward-looking information and forward-looking statements as defined in applicable securities laws (collectively referred to in this news release as "forward-looking statements"). Forward-looking statements contained in this news release may include, but are not limited to, zinc and other metal prices and exchange rate assumptions, projected operating and capital costs, metal or mineral recoveries, head grades, mine life, production rates, and returns; the Company's potential plans; the estimation of the tonnage, grade and content of deposits and the extent of the Mineral Resource and Mineral Reserve estimates; timing of commencement of production; exploration potential and results; the timing and receipt of necessary permits for future operations; the impacts of COVID-19 in our operations. These statements are based on information currently available to the Company and the Company provides no assurance that actual results and future performance and achievements will meet or not differ from the expectations of management or qualified persons. All statements other than statements of historical fact are forward-looking statements. The words "believe," "will," "may," "may have," "would," "estimate," "continues," "anticipates," "intends," "plans," "expects," "budget," "scheduled," "forecasts" and similar words are intended to identify estimates and forward-looking statements. Forward-looking statements are not guarantees and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Actual results and developments may be substantially different from the expectations described in the forward-looking statements for a number of reasons, many of which are not under our control, among them, the activities of our competition, the future global economic situation, weather conditions, market prices and conditions, exchange rates, and operational and financial risks. The unexpected occurrence of one or more of the abovementioned events may significantly change the results of our operations on which we have based our estimates and forward-looking statements. Our estimates and forward-looking statements may also be influenced by, among others, legal, political, environmental, or other risks that could materially affect the potential development of the Project, including risks related to outbreaks of contagious diseases or health crises impacting overall economic activity regionally or globally. These forward-looking statements related to future events or future performance and include current estimates, predictions, forecasts, beliefs and statements as to management's expectations with respect to, but not limited to, the business and operations of the Company and mining production, our growth strategy, the impact of applicable laws and regulations, future zinc and other metal prices, smelting sales, capex, expenses related to exploration and project evaluation, estimation of Mineral Reserves and/or Mineral Resources, mine life and our financial liquidity. Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable and appropriate by management and qualified persons considering their experience are inherently subject to significant uncertainties and contingencies and may prove to be incorrect. Statements concerning future production costs or volumes are based on numerous assumptions of management regarding operating matters and on assumptions that demand for products develops as anticipated, that customers and other counterparties perform their contractual obligations, full integration of mining and smelting operations, that operating and capital plans will not be disrupted by issues such as mechanical failure, unavailability of parts and supplies, labor disturbances, interruption in transportation or utilities, adverse weather conditions, and that there are no material unanticipated variations in metal prices, exchange rates, or the cost of energy, supplies or transportation, among other assumptions. Estimates and forward-looking statements refer only to the date when they were made, and we do not undertake any obligation to update or revise any estimate or forward-looking statement due to new information, future events or otherwise, except as required by law. Estimates and forward-looking statements involve risks and uncertainties and do not guarantee future performance, as actual results or developments may be substantially different from the expectations described in the forward-looking statements. Further information concerning risks and uncertainties associated with these forward-looking statements and our business can be found in our public disclosures filed under our profile on SEDAR (www.sedar.com) and on EDGAR (www.sec.gov). For further information, please contact: Roberta Varella - Head of Investor Relations SOURCE: Nexa Resources S.A. View source version on accesswire.com: https://www.accesswire.com/744295/Nexa-Provides-Update-on-Cerro-Lindo-Mine-Operation Source : Webdisclosure.com |
Cotations différées d'au moins 15 minutes (Paris, Amsterdam, Bruxelles, Lisbonne).
Cotations à la clôture (Francfort, New-York, Londres, Zurich).
Flux de cotations : Euronext (Places Euronext et Cours des Devises).
Bourse : technologie Cote Boursière