SAINT GOBAIN 85.440 € (+0,85 %)
AMUNDI 96.750 € (-0,36 %)
SANOFI 75.310 € (+1,35 %)
COFACE 16.100 € (-0,19 %)
TOMTOM 4.042 € (+1,56 %)
X-FAB 7.030 € (+3,84 %)
MAROC TELECOM 9.000 € (+0,22 %)
UMG 15.565 € (+2,71 %)
SOITEC 122.500 € (+1,45 %)
PHILIPS KON 23.130 € (+0,70 %)
UNILEVER 54.650 € (-0,78 %)
ATOS GROUP 31.700 € (-0,13 %)
CARVOLIX 6.200 € (-1,90 %)
ENERGY SOLAR 1.400 € (+1,08 %)
MEDINCELL 24.500 € (-1,69 %)
AALBERTS NV 45.080 € (+0,54 %)
L'OREAL 385.900 € (-1,15 %)
S.E.B. 59.500 € (-0,67 %)
BONDUELLE 8.610 € (-1,37 %)
LUMIBIRD 27.000 € (+1,50 %)
ADYEN 930.300 € (-0,31 %)
PEUGEOT INVEST 57.500 € (+0,35 %)
LAKEFRONT BIOTHER. 23.340 € (+3,83 %)
ENGIE 26.720 € (+0,60 %)
LVMH 480.000 € (-0,30 %)
CSG 17.714 € (-8,02 %)
ABN AMRO BANK N.V. 39.730 € (-0,13 %)
SBM OFFSHORE 32.400 € (-7,69 %)
BUREAU VERITAS 28.360 € (-0,28 %)
AB SCIENCE 1.000 € (+24,07 %)
KERING 286.650 € (-1,07 %)
BOUYGUES 48.640 € (-1,12 %)
AKZO NOBEL 63.520 € (-0,06 %)
NANOBIOTIX 33.460 € (+0,78 %)
HEINEKEN 77.140 € (-0,87 %)
ALTAREA 100.400 € (-0,20 %)
REMY COINTREAU 46.600 € (+2,69 %)
RUBIS 33.400 € (+0,30 %)
KAUFMAN ET BROAD 25.250 € (+0,60 %)
TELEPERFORMANCE 70.000 € (+1,92 %)
HAFFNER ENERGY 0.456 € (-1,19 %)
2CRSI 27.600 € (-0,79 %)
SHELL PLC 38.390 € (-1,01 %)
LISI 67.200 € (+1,66 %)
TRIGANO 152.900 € (+1,12 %)
V LANSCHOT KEMPEN 65.250 € (-0,76 %)
TIKEHAU CAPITAL 17.020 € (+0,59 %)
HEINEKEN HOLDING 72.650 € (-1,29 %)
Coca-ColaEuropacif 92.900 € (-1,06 %)
UNIFY GROUP 1.862 € (-0,53 %)
POSTNL 0.911 € (-2,57 %)
ASML HOLDING 1 499.000 € (+0,33 %)
PHARMING GROUP 0.960 € (+1,52 %)
EXAIL TECHNOLOGIES 124.600 € (+0,08 %)
VETOQUINOL 72.600 € (+1,82 %)
CTP 14.680 € (-3,17 %)
TOTALENERGIES 74.090 € (-0,60 %)
CROSSJECT 1.498 € (-1,45 %)
RELX 30.840 € (+1,05 %)
VEOLIA ENVIRON. 35.190 € (+0,34 %) |
10/08/2026 04:30
ZPMC Ships Topside Module for China's First Lightweight Integrated Offshore SubstationEQS-News: ZPMC / Key word(s): Contract SHANGHAI, Aug. 10, 2026 /PRNewswire/ -- Shanghai Zhenhua Heavy Industries (ZPMC) recently shipped the topside module of the offshore substation for the Guodian Tangshan Leting Yuetuo Island Offshore Wind Farm Phase I project. The entire operation, from roll-on loading to completion of sea fastening, took just four days. Located in North China, the Guodian Tangshan Leting Yuetuo Island Offshore Wind Farm Phase I project covers a sea area of 34 square kilometers, with a total installed capacity of 304 MW. The supporting offshore substation is designed with a capacity of 300 MW. As a key offshore clean energy project in the region, it will, once operational, help optimize North China's energy supply mix while supporting the region's green and low-carbon industrial transition. The offshore substation topside module is a three-story steel structure measuring 45 meters in length, 38 meters in width, and 23 meters in height, with a total weight of approximately 1,700 tonnes. ZPMC was responsible for the full-scope construction of the substation's topside module, lower foundation jacket, and steel pipe piles. Drawing on its proven expertise in offshore wind equipment fabrication, the company successfully completed each stage of construction.
![]() 10.08.2026 CET/CEST Dissemination of a Corporate News, transmitted by EQS News - a service of EQS Group. 2379636 10.08.2026 CET/CEST Source : Webdisclosure.com |
Cotations différées d'au moins 15 minutes (Paris, Amsterdam, Bruxelles, Lisbonne).
Cotations à la clôture (Francfort, New-York, Londres, Zurich).
Flux de cotations : Euronext (Places Euronext et Cours des Devises).
Bourse : technologie Cote Boursière
