FDJ UNITED 22.940 € (-1,12 %)
LOUIS HACHETTE 1.716 € (-3,97 %)
L'OREAL 374.950 € (-1,02 %)
AIRBUS 194.420 € (-0,78 %)
ELIOR GROUP 1.977 € (-0,85 %)
ESSILORLUXOTTICA 164.700 € (-0,27 %)
DANONE 71.000 € (-1,00 %)
LVMH 488.650 € (+1,18 %)
AIR LIQUIDE 176.340 € (-1,22 %)
MGI DIGITAL GRAPHI 10.900 € (-0,37 %)
EDENRED 25.550 € (+2,69 %)
SAFRAN 325.400 € (-0,73 %)
CAPGEMINI 90.900 € (+0,84 %)
IPSOS 34.740 € (-1,75 %)
HERMES INTL 1 659.500 € (+0,91 %)
SANOFI 75.350 € (-0,20 %)
SAINT GOBAIN 75.160 € (+0,72 %)
S.E.B. 48.800 € (+1,04 %)
ASM INTERNATIONAL 948.200 € (+2,22 %)
ASML HOLDING 1 615.600 € (+3,84 %)
CROSSJECT 1.594 € (-1,85 %)
KERING 251.100 € (+2,80 %)
UMG 18.155 € (-0,95 %)
POSTNL 0.919 € (-1,02 %)
RENAULT 25.990 € (+0,58 %)
SOCIETE GENERALE 75.760 € (+0,64 %)
PROSUS 40.550 € (+3,47 %)
SCHNEIDER ELECTRIC 274.050 € (+0,35 %)
B.COM.PORTUGUES 1.052 € (+0,24 %)
STMICROELECTRONICS 61.640 € (+0,46 %)
STELLANTIS NV 5.108 € (+2,28 %)
TELEPERFORMANCE 53.740 € (+0,56 %)
2CRSI 27.780 € (-1,49 %)
BOUYGUES 47.640 € (+0,74 %)
CVC CAPITAL 14.150 € (+2,98 %)
VINCI 119.800 € (+0,34 %)
AXA 43.940 € (-0,84 %)
BNP PARIBAS ACT.A 102.020 € (-0,29 %)
ARCELORMITTAL SA 58.840 € (+0,20 %)
APERAM 46.960 € (+0,21 %)
REXEL 39.440 € (+0,36 %)
TOMTOM 3.950 € (-13,87 %)
VIVENDI SE 1.882 € (-1,80 %)
VALNEVA 2.184 € (-1,00 %)
NEXANS 135.600 € (-0,15 %)
WORLDLINE 10.034 € (+5,41 %)
FERMENTALG 0.510 € (+2,20 %)
NRJ GROUP 6.800 € (-0,87 %)
FOUNTAINE PAJOT 90.000 € (+3,45 %)
KPN KON 4.320 € (-0,58 %)
BENETEAU 6.070 € (-0,16 %)
NOS, SGPS 4.900 € (-0,89 %)
UNILEVER 52.730 € (-1,49 %)
TOTALENERGIES 70.950 € (-0,35 %)
ING GROEP N.V. 28.885 € (+0,49 %)
VEOLIA ENVIRON. 37.550 € (+0,24 %)
ADYEN 837.700 € (+1,23 %)
CARREFOUR 16.300 € (-2,04 %)
LEGRAND 142.050 € (+0,04 %)
BOLLORE 4.050 € (-1,22 %) |
15/07/2026 07:00
FRIEDRICH VORWERK secures major contract as part of a joint venture (ARGE) to build the H2Coastlink 1 hydrogen pipeline from Emden to LeerEQS-News: Friedrich Vorwerk Group SE / Key word(s): Incoming Orders FRIEDRICH VORWERK secures major contract as part of a joint venture (ARGE) to build the H2Coastlink 1 hydrogen pipeline from Emden to Leer Tostedt, 15 July 2026 – Friedrich Vorwerk Group SE (ISIN DE000A255F11), a leading provider of energy infrastructure, has secured a major contract to build the “H2Coastlink 1” hydrogen pipeline between Emden and Leer. The company is acting as part of a joint venture (ARGE), and the contract was awarded by EWE NETZ GmbH in its role as general contractor for the project sponsor and transmission system operator, GTG Nord GmbH. At the heart of the project is a high-pressure hydrogen pipeline roughly 24 km long with a nominal diameter of DN 400. This is complemented by a connecting line from the future electrolyser to the hydrogen feed-in facility in Emden, together with the links to the supra-regional hydrogen network in Leer. The contract is valued in the double-digit millions of euros, and preparatory work is set to begin as early as summer 2026. The pipeline is scheduled to be handed over to GTG Nord GmbH, ready for operation, in autumn 2027. Planned by GTG Nord GmbH, the transmission system operator within the EWE Group, the pipeline will connect a 320 MW production plant that EWE Hydrogen GmbH is building in Emden-Borssum with the hydrogen infrastructure taking shape in Leer-Nord to the north-west. There, it will tie into Gasunie Deutschland’s “HyPerLink” hydrogen backbone and into GTG Nord GmbH’s gas transport pipeline. H2Coastlink 1 is one of several sub-projects actively backed by the German federal government’s IPCEI hydrogen programme and the State of Lower Saxony, and it forms part of Germany’s hydrogen core network – the grid linking the country’s key hydrogen sites, from major industrial hubs and storage facilities to power plants and import corridors. Around 90 crossings will be built along the route, with ecologically sensitive areas, watercourses and transport routes passed beneath using trenchless techniques such as horizontal directional drilling (HDD). With many new hydrogen and power plant sites still to be connected to the existing grid, and with the roughly 9,000 km hydrogen core network now taking shape, network operators are planning a wide range of new-build and conversion projects that are moving quickly towards implementation. As an end-to-end service provider with a broad portfolio of services and technologies and decades of experience in the pipeline construction segment, FRIEDRICH VORWERK expects demand in this area to keep growing in the years ahead.
Contact Details FRIEDRICH VORWERK Group SE Management Board Chairman of the Supervisory Board Court of Registration 15.07.2026 CET/CEST Dissemination of a Corporate News, transmitted by EQS News - a service of EQS Group.
2365724 15.07.2026 CET/CEST Source : Webdisclosure.com |
||||||||||||||||||||||||||||||||
Cotations différées d'au moins 15 minutes (Paris, Amsterdam, Bruxelles, Lisbonne).
Cotations à la clôture (Francfort, New-York, Londres, Zurich).
Flux de cotations : Euronext (Places Euronext et Cours des Devises).
Bourse : technologie Cote Boursière