FDJ UNITED 25.880 € (+0,23 %)
VIRIDIEN 127.100 € (+2,75 %)
LOUIS HACHETTE 1.588 € (+0,47 %)
STIF 42.650 € (-2,29 %)
NETMEDIA GROUP 0.486 € (-5,08 %)
AYVENS 10.210 € (-1,16 %)
CEGEDIM 11.850 € (-3,27 %)
OPMOBILITY 15.270 € (-1,67 %)
EXOSENS 63.500 € (-1,70 %)
CVC CAPITAL 11.080 € (-2,81 %)
STMICROELECTRONICS 28.695 € (-4,14 %)
HAVAS 14.964 € (-1,80 %)
SANOFI 82.520 € (-0,42 %)
UNIBAIL-RODAMCO-WE 97.000 € (-1,08 %)
AIRBUS 163.600 € (-2,56 %)
TOTALENERGIES 79.080 € (+1,96 %)
SAFRAN 283.500 € (-2,44 %)
ATOS 34.100 € (-4,85 %)
LECTRA 16.020 € (-2,67 %)
AXA 40.060 € (-0,27 %)
EXAIL TECHNOLOGIES 125.800 € (-3,97 %)
ASML HOLDING 1 134.400 € (-4,48 %)
SOCIETE GENERALE 63.900 € (-3,12 %)
HOPIUM 0.010 € (0,00 %)
MAUREL ET PROM 10.640 € (+4,72 %)
AIR LIQUIDE 179.360 € (-0,36 %)
ALSTOM 23.960 € (-3,70 %)
ARCELORMITTAL SA 44.650 € (-4,31 %)
VEOLIA ENVIRON. 32.970 € (-0,33 %)
STELLANTIS NV 6.369 € (+0,73 %)
CREDIT AGRICOLE 16.305 € (-1,66 %)
AIR FRANCE -KLM 8.906 € (-4,46 %)
INVENTIVA 4.495 € (-1,86 %)
Vusion 107.400 € (-3,33 %)
GALAPAGOS 25.500 € (-1,70 %)
UBISOFT ENTERTAIN 3.870 € (-0,31 %)
LVMH 467.100 € (-0,85 %)
BNP PARIBAS ACT.A 83.140 € (-2,62 %)
FRANCAISE ENERGIE 39.050 € (+2,49 %)
CBI 0.100 € (-11,11 %)
NEXITY 8.220 € (-1,62 %)
ENGIE 28.440 € (+0,14 %)
CSG 24.900 € (-0,40 %)
OSE IMMUNO 3.214 € (-1,77 %)
SHELL PLC 40.360 € (+2,11 %)
DBT 0.059 € (+15,23 %)
SCHNEIDER ELECTRIC 230.900 € (-3,77 %)
AMG 34.400 € (-3,37 %)
ICAPE HOLDING 4.360 € (-1,36 %)
CORBION 18.890 € (-0,63 %)
UNILEVER 47.950 € (-0,72 %)
SAINT GOBAIN 70.600 € (-2,19 %)
L'OREAL 354.250 € (-0,81 %)
SECHE ENVIRONNEM. 80.200 € (-0,50 %)
KALRAY 3.355 € (-4,14 %)
BIGBEN INTERACTIVE 0.278 € (+1,09 %)
ADYEN 838.700 € (-2,89 %)
PROSUS 39.625 € (-2,23 %)
EDENRED 17.410 € (+1,96 %)
VINCI 130.200 € (-1,81 %) |
02/04/2026 07:30
Nordex Group expands wind farm in Germany by an additional 40 MWEQS-News: Nordex SE / Key word(s): Incoming Orders Hamburg, 2 April 2026. End of March, the Nordex Group received an order totaling 39.9 MW from NeXtWind Management GmbH in Germany. As part of the Lütau 2 repowering project in the District of Duchy of Lauenburg in Schleswig-Holstein, Nordex will supply seven N149/5.X wind turbines on 125-meter tubular steel towers. The order also includes the Premium Service for the turbines over 20 years. The installation of the turbines is scheduled for spring 2027, with commissioning expected to be completed in summer 2027. This new construction phase expands the existing Lütau 1 wind farm, which already consists of five N149/5.X units and has been operating since 2025. With the addition of seven more turbines, the site's total capacity will be increased to 68.4 MW. Schleswig-Holstein has been one of Germany’s leading wind energy regions for many years. With excellent wind conditions and a high share of community projects, the state makes a major contribution to Germany’s climate protection strategy. Projects like Lütau 2 play an important role in the transformation of the energy system. About NeXtWind About the Nordex Group Contact person for press: Contact for investor inquiries: 02.04.2026 CET/CEST Dissemination of a Corporate News, transmitted by EQS News - a service of EQS Group.
2302536 02.04.2026 CET/CEST Source : Webdisclosure.com |
||||||||||||||||||||||||||||||||||
Cotations différées d'au moins 15 minutes (Paris, Amsterdam, Bruxelles, Lisbonne).
Cotations à la clôture (Francfort, New-York, Londres, Zurich).
Flux de cotations : Euronext (Places Euronext et Cours des Devises).
Bourse : technologie Cote Boursière