SCHNEIDER ELECTRIC 237.500 € (-4,08 %)
ESSILORLUXOTTICA 184.300 € (+3,42 %)
ASM INTERNATIONAL 729.800 € (-7,57 %)
SANOFI 79.740 € (+4,71 %)
WOLTERS KLUWER 87.000 € (+2,72 %)
HEINEKEN 79.560 € (+2,21 %)
ALTAREA 73.700 € (-0,81 %)
EXOR NV 71.200 € (-0,35 %)
L'OREAL 436.950 € (+2,93 %)
ADYEN 826.900 € (+1,35 %)
CALIBRE 0.000 € (-25,00 %)
CARREFOUR 13.045 € (-0,27 %)
SHELL PLC 48.680 € (+0,56 %)
BE SEMICONDUCTOR 154.000 € (-5,72 %)
ACHETER-LOUER.FR 0.000 € (0,00 %)
ASML HOLDING 1 412.800 € (-6,11 %)
NOS, SGPS 5.210 € (+2,36 %)
THALES 235.700 € (-1,13 %)
AIR LIQUIDE 180.900 € (+1,98 %)
TOTALENERGIES 85.430 € (+0,98 %)
STELLANTIS NV 4.142 € (-1,94 %)
SOCIETE GENERALE 60.990 € (-2,28 %)
BIOPHYTIS 0.031 € (-7,78 %)
DANONE 65.520 € (+1,77 %)
ABIVAX 79.050 € (-2,53 %)
DASSAULT AVIATION 307.000 € (-0,26 %)
BASIC-FIT 29.460 € (-0,47 %)
ALFEN 10.240 € (-1,35 %)
PROSUS 34.290 € (-0,04 %)
ENGIE 23.430 € (-0,72 %)
BNP PARIBAS ACT.A 85.650 € (-2,28 %)
LEGRAND 131.000 € (-2,67 %)
KERING 177.460 € (+0,67 %)
ARCELORMITTAL SA 53.600 € (-2,15 %)
HERMES INTL 1 293.500 € (+2,17 %)
BOUYGUES 40.800 € (-0,95 %)
RENAULT 27.650 € (-1,85 %)
ORANGE 14.470 € (+0,21 %)
UNIBAIL-RODAMCO-WE 91.040 € (-0,61 %)
EUROFINS SCIENT. 87.720 € (+0,73 %)
WERELDHAVE 17.260 € (+1,29 %)
SIGNIFY NV 15.260 € (-0,52 %)
AEGON 7.394 € (-1,04 %)
AKZO NOBEL 59.300 € (+0,75 %)
STMICROELECTRONICS 41.880 € (-5,26 %)
UNILEVER 58.600 € (+2,36 %)
GTT 185.700 € (-2,88 %)
RANDSTAD NV 40.960 € (+1,76 %)
MAUREL ET PROM 8.140 € (+0,43 %)
BUREAU VERITAS 29.300 € (+0,76 %)
CVC CAPITAL 13.420 € (+1,67 %)
CEGEDIM 9.700 € (-0,21 %)
POSTNL 0.802 € (-0,50 %)
CREDIT AGRICOLE 14.990 € (-1,99 %)
EURONEXT 177.600 € (+0,40 %)
ARCADIS 45.300 € (+0,35 %)
ING GROEP N.V. 28.255 € (-2,06 %)
AHOLD DEL 32.750 € (+0,71 %)
LVMH 387.000 € (+0,82 %)
ABN AMRO BANK N.V. 39.620 € (-1,34 %) |
30/10/2026 12:20
Silver X Files NI 43-101 Technical Report for the Updated Nueva Recuperada Mineral Resource: 10.4 Mt Measured and Indicated at 202 g/t AgEq (67.3 Moz AgEq) and 21.6 Mt Inferred at 260 g/t AgEq (184.3 Moz AgEq)VANCOUVER, BC / ACCESS Newswire / October 30, 2026 / SILVER X MINING CORP. (TSXV:AGX)(OTCQX:AGXPF)(F:AGX) ("Silver X" or the "Company"), a growing precious metals producer building a multi-asset platform in Peru, announces that it has filed on SEDAR+ the technical report titled "NI 43-101 Technical Report Updated Mineral Resource Estimation for the Nueva Recuperada Property, Peru" (the "Technical Report"), with an effective date of August 31, 2026 and a report date of October 26, 2026. The Technical Report supports the updated Mineral Resource Estimate ("MRE") for the Company's Nueva Recuperada Project in Huancavelica, Peru, first announced in the Company's news release of September 22, 2026 (the "September News Release"). The Technical Report was prepared by Mr. A. David Heyl, B.Sc., C.P.G., and is available under the Company's profile on SEDAR+ at www.sedarplus.ca and on the Company's website. Measured and Indicated resources total 10.4 million tonnes containing 67.3 million ounces AgEq, including 38.8 million ounces of silver, nearly three times the tonnage of the previous estimate of May 31, 2025. Inferred resources total 21.6 million tonnes containing 184.3 million ounces AgEq, including 120.1 million ounces of silver. During the finalization of the Technical Report, certain figures were revised from those disclosed in the September News Release. The revisions do not change the tonnage or the classification of any Mineral Resource. Measured and Indicated AgEq ounces decreased by 3.5 million ounces (4.9%), while Inferred AgEq ounces increased by 3.5 million ounces (1.9%). See "Reconciliation with the September 22, 2026 News Release" below. Highlights
Reconciliation with the September 22, 2026 News Release In the course of finalizing the Technical Report, the Qualified Person and the Company identified and corrected the following items in the Mineral Resource tables disclosed in the September News Release. No change was made to tonnages, cut-off, metal prices, metallurgical recoveries or resource classification.
Comparison with the September News Release
Measured resources are unchanged. Gold, lead and copper contents are unchanged in all categories. Inferred contained metal includes Ccasahuasi; Inferred tonnes and grades exclude it (see Note 4). All other information in the September News Release remains unchanged. CEO Commentary José M. Garcia, CEO, commented, "With the Technical Report now filed, the update stands on the record: we have nearly tripled the silver in the resources that mines are planned and financed on. Two mining unit stories drive it. Blenda Rubia is a different kind of mine for us: not a vein, but a wide silver hydrothermal breccia dike body averaging more than eleven meters wide, with 5.5 million tonnes already in the Indicated category. And Red Silver, the highest silver-grade part of our district, hosts more than ten million ounces of Measured and Indicated silver at around 20 ounces per tonne. The Plata unit now has two engines, at Plata high-grade veins we can mine selectively and at BR bulk tonnage we can mine at a much lower cost per tonne. Approximately eighty-five percent of the 12.25 million tonne inventory in our 2025 PEA now sits in our higher-confidence categories, against less than a third when the PEA was published, and it feeds the plant we are already expanding. The next PEA will be about how much bigger this district can be." Updated Mineral Resources Nueva Recuperada Project Mineral Resources (effective August 31, 2026)
Totals include Tangana, Plata (including Blenda Rubia), Red Silver, All Other Veins and, for contained metal only, Ccasahuasi. See Notes on Mineral Resources. Against the previous estimate of May 31, 2025, Measured and Indicated tonnage increased 173%, silver ounces 189% and AgEq ounces 107%. Inferred tonnage increased 43%. Plata Mining Unit Mineral Resource Estimate (effective August 31, 2026):
α Plata resources converted from short tons to metric tonnes using a factor of 0.9. BR figures are unchanged from the September News Release. Estimation Methodology and QA/QC The estimation methodology, data verification and QA/QC procedures supporting the Mineral Resource Estimate are unchanged from those described in the September News Release and are set out in full in the Technical Report. Notes on Mineral Resources
Cautionary Statement Regarding the PEA The 2025 PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the preliminary economic assessment will be realized. Mineral resources are not mineral reserves and do not have demonstrated economic viability. Qualified Person The Technical Report, with an effective date of August 31, 2026, was prepared by Mr. A. David Heyl, B.Sc., C.P.G., a qualified person as defined by NI 43-101, who has reviewed and approved the scientific and technical content of this news release for Silver X. Mr. A. David Heyl is a consultant for Silver X. About Silver X Silver X is a growing silver producer building a multi-asset precious metals platform in Peru. The Company's portfolio includes the Nueva Recuperada Project, a district-scale land package of 20,795 hectares with three mining units and more than 200 exploration targets, as well as the recently acquired Pampas Project. With existing production, scalable expansion opportunities, and significant exploration upside, Silver X is positioned for continued growth and long-term value creation. For more information visit our website at www.silverxmining.com. ON BEHALF OF THE BOARD José M. Garcia For further information, please contact: Susan Xu Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Cautionary Note Regarding Production without Mineral Reserves The decision to commence production at the Nueva Recuperada Project and the Company's ongoing mining operations as referenced herein (the "Production Decision and Operations") are based on economic models prepared by the Company in conjunction with management's knowledge of the property and the existing estimate of mineral resources on the property. The Production Decision and Operations are not based on a pre-feasibility study or a feasibility study of mineral reserves demonstrating economic and technical viability. Accordingly, there is increased uncertainty and economic and technical risks of failure associated with the Production Decision and Operations, in particular: the risk that mineral grades will be lower than expected; the risk that additional construction or ongoing mining operations are more difficult or more expensive than expected; and production and economic variables may vary considerably. Cautionary Statement Regarding "Forward-Looking" Information This press release contains forward looking information within the meaning of applicable Canadian securities legislation ("forward looking information"). Forward looking information is generally identified by words such as "plans", "expects", "estimates", "intends", "anticipates", "targets", "believes", or similar expressions, including statements that certain events or results "may", "could", "would" or "will" occur. All statements other than historical facts constitute forward looking information, including, without limitation, statements regarding the Mineral Resource Estimate, the conversion of Inferred resources, future drilling, the 2025 PEA and an updated PEA, the expansion and permitting of the Recuperada plant, and the Company's growth plans. Forward looking information is based on a number of assumptions, including that general economic and business conditions will not materially worsen; commodity demand and prices will remain stable or improve; required permits and approvals will be obtained on a timely basis; operations will not be materially disrupted by accidents, labour issues or equipment failures; financing will be available; equipment and supplies will be accessible as needed; resource estimates and underlying assumptions (including size, grade and recovery) are reasonable; and the Company will be able to attract and retain qualified personnel and execute its strategic objectives. Forward looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward looking information, including but not limited to those risks described in the Company's annual and interim MD&As and in its public documents filed on www.sedarplus.ca from time to time. Readers should not place undue reliance on forward looking information. The Company does not undertake to update any forward looking information, except in accordance with applicable securities laws. SOURCE: Silver X Mining Corp. View the original press release on ACCESS Newswire Source : Webdisclosure.com |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cotations différées d'au moins 15 minutes (Paris, Amsterdam, Bruxelles, Lisbonne).
Cotations à la clôture (Francfort, New-York, Londres, Zurich).
Flux de cotations : Euronext (Places Euronext et Cours des Devises).
Bourse : technologie Cote Boursière