COMPAGNIE ODET 1 028.000 € (+2,59 %)
AXA 42.150 € (+0,19 %)
KERING 209.250 € (-0,50 %)
LAGARDERE SA 18.000 € (0,00 %)
PEUGEOT INVEST 51.600 € (0,00 %)
BE SEMICONDUCTOR 203.000 € (-0,88 %)
LVMH 380.900 € (+0,62 %)
ARTMARKET COM 3.270 € (-2,10 %)
AHOLD DEL 31.460 € (-0,13 %)
AIR LIQUIDE 170.760 € (+0,35 %)
BNP PARIBAS ACT.A 92.760 € (+0,76 %)
SAINT GOBAIN 66.120 € (-1,46 %)
DSM FIRMENICH AG 97.200 € (+1,08 %)
AKZO NOBEL 57.720 € (+1,83 %)
CBO TERRITORIA 3.580 € (-3,50 %)
L'OREAL 373.450 € (+0,19 %)
HEIJMANS KON 85.500 € (-3,88 %)
ING GROEP N.V. 31.035 € (+1,14 %)
BANIJAY GROUP 8.200 € (0,00 %)
HAFFNER ENERGY 0.784 € (+7,69 %)
ASML HOLDING 1 656.200 € (+0,19 %)
ARCADIS 40.100 € (+1,31 %)
TIKEHAU CAPITAL 15.640 € (-0,26 %)
GECINA 60.200 € (+1,35 %)
FORVIA 8.734 € (+1,63 %)
PROSUS 35.285 € (+2,28 %)
STIF 19.500 € (+2,69 %)
GROUPE CRIT 48.300 € (+0,21 %)
FERMENTALG 0.467 € (+2,75 %)
ARCELORMITTAL SA 57.600 € (+0,56 %)
IMCD 95.720 € (+0,53 %)
ELIS 21.420 € (+0,56 %)
VINCI 106.150 € (-0,61 %)
GTT 213.000 € (+1,43 %)
AIRBUS 189.080 € (-0,12 %)
SANOFI 69.990 € (-1,16 %)
ESSILORLUXOTTICA 144.500 € (+1,19 %)
UNILEVER 53.080 € (+0,45 %)
AUBAY 49.650 € (-0,70 %)
ACCOR 43.700 € (-1,13 %)
ABN AMRO BANK N.V. 42.350 € (+0,95 %)
HERMES INTL 1 286.000 € (-1,04 %)
INTERPARFUMS 30.100 € (+1,28 %)
VALLOUREC 18.395 € (+2,97 %)
CROSSJECT 1.310 € (0,00 %)
VEOLIA ENVIRON. 30.460 € (-0,88 %)
CREDIT AGRICOLE 16.930 € (+0,27 %)
STMICROELECTRONICS 50.870 € (+1,05 %)
EURAZEO 44.680 € (-0,27 %)
VIEL ET COMPAGNIE 18.300 € (+0,33 %)
TOTALENERGIES 75.800 € (+1,80 %)
SAFRAN 329.800 € (-0,09 %)
MR BRICOLAGE 2.840 € (-4,05 %)
BUREAU VERITAS 26.330 € (-0,90 %)
NETGEM 1.015 € (-1,93 %)
LINEDATA SERVICES 54.000 € (-0,37 %)
FOUNTAINE PAJOT 75.700 € (-3,57 %)
MGI DIGITAL GRAPHI 8.320 € (-2,46 %)
EBUSCO HOLDING 0.194 € (-0,31 %)
EDENRED 27.250 € (+0,55 %) |
14/09/2026 07:30
Nordex Group receives 34 MW order in Germany: N175/6.X on 199-metre hub heightEQS-News: Nordex SE / Key word(s): Incoming Orders Hamburg, 14 September 2026. The Nordex Group has received an order for 34 MW in Hesse from EEF Erneuerbare Energien Fabrik GmbH. For the Rauschenberg wind farm, the Nordex Group will supply and install five N175/6.X turbines. The turbines will be installed on towers with a hub height of 199 metres. The order also includes a Premium Service contract for a period of 20 years. Delivery and installation of the N175/6.X turbines from the end of 2027 will take place as part of a repowering project. By replacing five existing older wind turbines with an installed capacity of 3 MW with more powerful 6.8 MW turbines, electricity generation at the site can be significantly increased from summer 2028. The number of turbines will remain unchanged. With a hub height of 199 metres and its large rotor, the N175/6.X also harnesses stronger and more consistent wind flows at higher altitudes. This results in higher energy yields, improved site utilisation and increased electricity production, particularly during periods of lower wind. “The Rauschenberg project is a prime example of the next generation of wind energy. Through repowering, we will be able to generate significantly more renewable electricity at an established site in the future, bring agriculture and renewables together and thereby make an important contribution to regional energy supply. The trusting cooperation with Nordex on an equal footing is an important foundation for the successful implementation of the project,” says Lukas Jörgens, Project Manager Rauschenberg at EEF Erneuerbare Energien Fabrik. “The order for the Rauschenberg wind farm from EEF demonstrates the potential that modern repowering projects offer for a faster energy transition and more efficient use of existing sites. With the N175/6.X on 199-metre towers, we are deploying a technology that enables very high energy yields even at low-wind sites and strengthens the economics of projects. At the same time, this order underlines the continued strong demand for our high-performance wind turbines in Germany and our customers’ confidence in the competitiveness of our technology. We thank EEF for their trust and good cooperation,” says Karsten Brüggemann, Vice President Region Europe of the Nordex Group. In March 2026, the Nordex Group had already received its first order for the delivery of three N175/6.X turbines with the same hub height of 199 metres for a project in North Rhine-Westphalia. About EEF Erneuerbare Energien Fabrik GmbH About the Nordex Group Contact person for press: Contact for investor inquiries: 14.09.2026 CET/CEST Dissemination of a Corporate News, transmitted by EQS News - a service of EQS Group.
2398072 14.09.2026 CET/CEST Source : Webdisclosure.com |
||||||||||||||||||||||||||||||||||||
Cotations différées d'au moins 15 minutes (Paris, Amsterdam, Bruxelles, Lisbonne).
Cotations à la clôture (Francfort, New-York, Londres, Zurich).
Flux de cotations : Euronext (Places Euronext et Cours des Devises).
Bourse : technologie Cote Boursière